# Prospect Controls (PROSPECT.CONTROL)
Read Time: 1 minute(s)
Form Details
Form Details
Purpose
The PROSPECT.CONTROL procedure is used to define default information which
will be used by the prospect entry procedure. This is where the user can
define valid type and status codes to be used.
Frequency of Use
The entries in this procedure should be loaded prior to using the PROSPECT.E procedure. If entries are not made, the user will be allowed to place any user-defined codes in the corresponding fields.
Prerequisites
None.