# Engineering Data Entry Procedures

Read Time: 1 minute(s)

BOM.E Enter or Modify Bills of Material
BOM.E2 Bill of Material Import
CAT.CONTROL Define Valid Categories
COST.CONTROL Enter Product Costing Control Parameters
COST.E Define Product Costs
ECN.CONTROL Engineering Change Notice Control Parameters
ECN.E Engineering Change Notice Entry
ECN.E2 Engineering Change Notice Approval
EXPORT.CONTROL Export Codes Definition
PARTCHANGE.E Part Master Mass Change
PARTS.E Enter or Modify Parts Information
PRODCON.E Define Product Configuration Options
PRODCON.E2 Configure Products
SPEC.CONTROL Enter Valid Specification Codes
UM.CONTROL Define valid unit of measure codes
WEB.CONTROL WEB Site Control Parameters

Version 8.10.57