# Cost Control Entry (COST.CONTROL)

Read Time: 1 minute(s)

Form Details
Cost Control Parameters

Purpose
The COST.CONTROL procedure maintains the material overhead amounts used by the cost rollup procedure ( COST.P1 ) and the default labor overhead amounts used by the work center entry procedure ( WC.E ). If a work center in a routing does not specify one of the overhead amounts then the labor defaults are used by the cost rollup procedure.

Frequency of Use
Usually entered when the system is first setup, but may be changed as required.

Prerequisites
None.

Version 8.10.57