# ECN Approval (ECN.E2)

Read Time: 1 minute(s)

Form Details
Form Details

Purpose
The ECN.E2 procedure is used to approve Engineering Change Notices that have already been created by ECN.E . The only fields that can be updated in this procedure are Approval Name and Approval Date. This procedure will check the login ID to make sure it is authorized for the approval type. The authorized login ID's are specified on ECN.CONTROL . The ECN.R2 report can be run to check for unposted ECN's that require approval or that are fully approved.

Frequency of Use
As required.

Prerequisites
Entry of the ECN control parameters through ECN.CONTROL .

Version 8.10.57