# Costed Bill of Material Listing (BOM.R2)

Read Time: 1 minute(s)

Form Details
Form Details

Purpose
The BOM.R2 procedure is used to create costed bill of material listings. The user may specify each bill of material he would like to see by entering the part number which identifies it. The user may also enter any of the parts file cross-reference items which include model number, category, and manufacturer part number. If these are entered the system will automatically substitute the corresponding part number, or display a list of possible part numbers which can be chosen.

The user must also specify which set of standard costs to use for output. The options are Current, Standard and Previous.

Frequency of Use
As

Prerequisites
Entry of the specified Bill of Material records ( BOM.E ).

Data Fields

Item The line item number.
Part The part number of the component.
Desc The first line of the description for the associated part number.
Code One of the following four codes defining the part. C - Component part A - Assembly P - Phantom assembly L - Line
Qty The quantity required of the part to make one unit of the assembly defined by the bill of material.
UM The unit of measure associated with the quantity.
Material The material cost for the associated part.
Labor The labor cost for the associated part.
Outside Processing The outside processing cost for the associated part.
Fixed Overhead The fixed overhead cost for the associated part.
Variable Overh ead The variable overhead for the associated part.
Material Overh ead The material overhead for the associated part.

Version 8.10.57