# Part Master Mass Change (PARTCHANGE.E)

Read Time: 2 minute(s)

Form Details
Selection Control
General Changes
Material Control Changes
Customer/Supplier
Images
Parts Selected
Select Text

Purpose
The purpose of PARTCHANGE.E is to mass change/update data on selected parts. The first tab of this procedure is labeled SELECTION CONTROL and is used to select the parts based on part number range, category range, prodcon/configuration id or text file. Once the parts have been selected, they will be displayed on PARTS SELECTED tab. You may add or delete items from the list. You may also manually enter the part numbers into the list without having used the above selection options.

The GENERAL CHANGES, MATERIAL CONTROL CHANGES, CUSTOMER/SUPPLIER and IMAGES tabs mimic the tabs in the PARTS.E (master parts entry) procedure. If you wish to change the existing data, enter the new value in the appropriate field. For example, to change the status of the parts to "I" (i.e. inactive), type in "I" in the status field on the GENERAL CHANGES tab.

On the MATERIAL CONTROL CHANGES tab, you may update the planning group data. If you use multiple planning groups, you will need to update the data for each planning group separately.

If you wish to clear the data from a field enter the tilde (~) character in the field. Please note that there are certain fields (e.g. status and type) that you may not clear.

Certain fields allow multiple entries/values to be entered. An example would be the specs or vendor number fields. If you type in a new vendor, all existing vendors will be deleted and replaced with the new vendor(s) entered in this procedure. If you use the tilde character to clear the data, all existing data will be cleared not just the first vendor or first spec entered.

Frequency of Use
As required.

Prerequisites
Part numbers must exist in the database. This procedure cannot be used to create new parts.

Version 8.10.57