# Planning Bill Entry (PB.E)

Read Time: 2 minute(s)

Form Details
Form Details

Purpose
The PB.E procedure is used to define planning bills for use with the MPS system. Planning bills allow you to build a multi-level structure that is similar to that of a bill of material, in which each planning bill references one or more items. Some of these items will be other planning bills that reference their own set of items. The difference is that each item is associated with a percentage instead of a quantity. The way in which this percentage is applied depends on how you intend to use the planning bill.

There are three different ways to utilize planning bills. You can generate master schedule items at multiple levels, sales forecast at multiple levels, or sales forecast at the top level and production forecast at lower levels.

The method for generating multi-level master schedule or sales forecast items is the same. You define the planning bills at each level and specify the items with their associated percentages. Then you enter the dates and quantities you are projecting for the top level planning bills only, not the lower level bills. Then you run the PB.P1 procedure which generates either sales forecast or master schedule items based on the parameters you provide when the procedure is run. If you select the multi-level option then the percentages you defined will be used to generate the appropriate percentages for each date and quantitiy in the lower level bills.

To generate sales forecast at the top level with production forecast at the lower levels you would follow the same procedure as described above except you must answer "No" to the multi-level option in PB.P1 . This will generate sales forecast for the items in the top level bill only. To generate the lower level production forecast you would answer "Yes" to the multi-level option in MPS.P1 which will then use the data in the lower level bills against unconsumed forecast from the higher levels. The difference between the two methods is that the production forecast method allows you to use the planning bills to forecast lower level items such as product options for only the portion of the of sales forecast that has not already been consumed by actual sales. When using planning bills in this fashion, the record IDs for each bill must be defined as assemblies in the parts master.

Note: Make sure that you do not answer "Yes" to the multi-level option
in both PB.P1 and MPS.P1 . This will inflate the forecast at lower
levels.

Frequency of Use
This process is usually performed once at the beginning of each planning cycle, with adjustments made as required.

Prerequisites
Part numbers must be defined in PARTS.E .

Version 8.10.57