# Master Schedule Entry (MS.E)

Read Time: 1 minute(s)

Form Details
Form Details

Purpose
The MS.E procedure is used to define master schedule items used in the MPS planning process. The master schedule defines the planned production for the factory. Until a master schedule item or work order is present there is no demand shown for lower level assemblies and components, even if there is demand at the top level. This is a primary difference between the MPS and MRP processes. MRP will inform you of suggested changes to the schedule when demand changes, and assumes that you will go along with these suggestions and change the schedule. MPS informs you of the changes but does not assume you will follow them. You have to actually make the change before it affects lower levels. This allows tighter control of the load on the factory.

Using MS.E you lay-out the planned completion dates and quantities for the item. If you use PLAN.E or WO.E screens to release master schedule items as work orders, then each date and quantity that is consumed will be flagged so that it no longer appears on the MPS since it has been replaced by a firm order. If you enter work orders on WO.E without selecting a master schedule item, you will need to remove the planned dates from the MS.E manually.

Master schedule items may also be created automatically based on planning bills. (See PB.E and PB.P1 )

Frequency of Use
As required.

Prerequisites
Plan Group must be entered on PLAN.CONTROL . Part numbers must be defined in PARTS.E .