# Product Cost Entry (COST.E)

Read Time: 12 minute(s)

# Cost Elements

Part Number Enter the part number associated to the costs to be entered or changed.

Description Displays the description of the associated part number as it appears in the PARTS master file. Only the first line is displayed.

Cost Group Enter the cost group which will be validated against INV.CONTROL . The cost group is used to define the costing method and to group inventory locations together for averaging the cost within those locations.

Total Current Cost The amount in this field represents the total cost of the associated part number, and is the total of all of the other costs.

Current Material Enter the material cost for the associated part number if the part is a component or line stock item. If the part number identifies an assembly then this amount will be calculated and loaded by the cost rollup procedure.

Current Labor If the associated part number identifies an assembly then the labor amount will be calculated and loaded by the cost rollup procedure. You may enter this cost directly if have not specified a routing for the part in the parts master record. If you enter a cost, only enter the amount incurred for this part number. Do not include lower level labor costs.

Curr Outside Processing Enter the outside processing costs for this part if it identifies an assembly. Enter only the amount incurred at the level of this part, do not include sub-level costs.

Curr Fixed Overhead Contains the top level labor fixed overhead for part as calculated by the cost rollup procedure.

Curr Variable Overhead Contains the top level labor variable overhead for the part as calculated by the cost rollup procedure.

Curr Material Overhead Contains the amount of top level material overhead calculated for this part by the cost rollup procedure.

Cur Frt Pct Enter the freight percentage for the associated part number if the part is a component or line stock item. If the part number identifies an assembly then the freight amount will be calculated and loaded by the cost rollup procedure. The freight amount in the next prompt will be calculated using the freight% entered times the material cost. Optionally, this prompt can be left null and the freight amount can be entered directly.

Cur Frt Amt Enter the freight cost for the associated part number if the part is a component or line stock item. If the part number identifies an assembly then this amount will be calculated and loaded by the cost rollup procedure. If a freight percentage has already been entered then this amount will be calculated using the % entered times the material cost and may not be changed, unless the % is removed.

Cur Other Desc Enter the description for any other cost for the associated part number.

Cur Other Amt Enter an amount and account for the associated part number if other predefined costs are to be captured during the receiving process for buy parts, or the work order finalization process for make parts. This cost will be rolled up into the total cost.

Cur Other Acct Enter an amount and account for the associated part number if other predefined costs are to be captured during the receiving process for buy parts, or the work order finalization process for make parts. The account number will be used when posting variances.

Cur Other Notes Enter any notes that pertain to the other costs defined.

Curr Sub Material Contains the sum of all sub-level material costs for the part as calculated by the cost rollup procedure.

Curr Sub Labor Contains the total of all sub-level labor costs for the part as calculated by the cost rollup procedure.

Curr Sub Outside Process Contains the total of all sub-level outside processing costs for the part as calculated by the cost rollup procedure.

Curr Sub Fixed Overhead Contains the total of all sub-level fixed overhead costs fror the part as calculated by the cost rollup procedure.

Curr Sub Variable Ovhd Contains the total of all sub-level variable overhead costs for the part as calculated by the cost rollup procedure.

Curr Sub Material Ovhd Contains the total of all sub-level material overhead costs for the part as calculated by the cost rollup procedure.

Sub Cur Frt Amt Contains the sum of all sub-level freight costs for the part as calculated by the cost rollup procedure.

Sub Cur Other Contains the sum of all sub-level "other" costs for the part as calculated by the cost rollup procedure.

Curr Std Lot Size Enter the standard lot size associated with the part number for calculating costs of purchased parts. This lot size is only used when calculating the material overhead that should be applied to the part. The lot size on the routing file is used in the calculation of labor.

Total Standard Cost The amount in this field represents the total cost of the associated part number, and is the total of all of the other costs.

Standard Material Enter the material cost for the associated part number if the part is a component or line stock item. If the part number identifies an assembly then this amount will be calculated and loaded by the cost rollup procedure.

Standard Labor If the associated part number identifies an assembly then the labor amount will be calculated and loaded by the cost rollup procedure. You may enter this cost directly if have not specified a routing for the part in the parts master record. If you enter a cost, only enter the amount incurred for this part number. Do not include lower level labor costs.

Std Outside Processing Enter the outside processing costs for this part if it identifies an assembly. Enter only the amount incurred at the level of this part, do not include sub-level costs.

Std Fixed Overhead Contains the top level labor fixed overhead for part as calculated by the cost rollup procedure.

Std Variable Overhead Contains the top level labor variable overhead for the part as calculated by the cost rollup procedure.

Std Material Overhead Contains the amount of top level material overhead calculated for this part by the cost rollup procedure.

Std Frt Pct Enter the freight percentage for the associated part number if the part is a component or line stock item. If the part number identifies an assembly then the freight amount will be calculated and loaded by the cost rollup procedure. The freight amount in the next prompt will be calculated using the freight% entered times the material cost. Optionally, this prompt can be left null and.the freight amount can be entered directly.

Std Frt Amt Enter the freight cost for the associated part number if the part is a component or line stock item. If the part number identifies an assembly then this amount will be calculated and loaded by the cost rollup procedure. If a freight percentage has already been entered then this amount will be calculated using the % and may not be changed, unless the % is removed.

Std Other Desc Enter the description for any other cost for the associated part number.

Std Other Amt Enter an amount and account for the associated part number if other predefined costs are to be captured during the receiving process for buy parts, or the work order finalization process for make parts. This cost will be rolled up into the total cost.

Std Other Acct Enter an amount and account for the associated part number if other predefined costs are to be captured during the receiving process for buy parts, or the work order finalization process for make parts. The account number will be used when posting variances.

Std Other Notes Enter any notes that pertain to the other costs defined.

Std Sub Material Contains the sum of all sub-level material costs for the part as calculated by the cost rollup procedure.

Std Sub Labor Contains the total of all sub-level labor costs for the part as calculated by the cost rollup procedure.

Std Sub Outside Process Contains the total of all sub-level outside processing costs for the part as calculated by the cost rollup procedure.

Std Sub Fixed Overhead Contains the total of all sub-level fixed overhead costs fror the part as calculated by the cost rollup procedure.

Std Sub Variable Overhead Contains the total of all sub-level variable overhead costs for the part as calculated by the cost rollup procedure.

Std Sub Material Overhead Contains the total of all sub-level material overhead costs for the part as calculated by the cost rollup procedure.

Sub Std Frt Amt Contains the sum of all sub-level freight costs for the part as calculated by the cost rollup procedure.

Sub Std Other Contains the sum of all sub-level "other" costs for the part as calculated by the cost rollup procedure.

Std Lot Size Enter the standard lot size associated with the part number for calculating costs of purchased parts. This lot size is only used when calculating the material overhead that should be applied to the part. The lot size on the routing file is used in the calculation of labor.

Total Previous Cost The amount in this field represents the total cost of the associated part number, and is the total of all of the other costs.

Previous Material Enter the material cost for the associated part number if the part is a component or line stock item. If the part number identifies an assembly then this amount will be calculated and loaded by the cost rollup procedure.

Previous Labor If the associated part number identifies an assembly then the labor amount will be calculated and loaded by the cost rollup procedure. You may enter this cost directly if have not specified a routing for the part in the parts master record. If you enter a cost, only enter the amount incurred for this part number. Do not include lower level labor costs.

Prev Outside Processing Enter the outside processing costs for this part if it identifies an assembly. Enter only the amount incurred at the level of this part, do not include sub-level costs.

Prev Fixed Overhead Contains the top level labor fixed overhead for part as calculated by the cost rollup procedure.

Prev Variable Overhead Contains the top level labor variable overhead for the part as calculated by the cost rollup procedure.

Prev Material Overhead Contains the amount of top level material overhead calculated for this part by the cost rollup procedure.

Prv Frt Pct Enter the freight percentage for the associated part number if the part is a component or line stock item. If the part number identifies an assembly then the freight amount will be calculated and loaded by the cost rollup procedure. The freight amount in the next prompt will be calculated using the freight% entered times the material cost. Optionally, this prompt can be left null and.the freight amount can be entered directly.

Prv Frt Amt Enter the freight cost for the associated part number if the part is a component or line stock item. If the part number identifies an assembly then this amount will be calculated and loaded by the cost rollup procedure. If a freight percentage has already been entered then this amount will be calculated using the % and may not be changed, unless the % is removed.

Prv Other Desc Enter the description for any other cost for the associated part number.

Prv Other Amt Enter an amount and account for the associated part number if other predefined costs are to be captured during the receiving process for buy parts, or the work order finalization process for make parts. This cost will be rolled up into the total cost.

Prv Other Acct Enter an amount and account for the associated part number if other predefined costs are to be captured during the receiving process for buy parts, or the work order finalization process for make parts. The account number will be used when posting variances.

Prv Other Notes Enter any notes that pertain to the other costs defined.

Prev Sub Material Contains the sum of all sub-level material costs for the part as calculated by the cost rollup procedure.

Prev Sub Labor Contains the total of all sub-level labor costs for the part as calculated by the cost rollup procedure.

Prev Sub Outside Process Contains the total of all sub-level outside processing costs for the part as calculated by the cost rollup procedure.

Prev Sub Fixed Overhead Contains the total of all sub-level fixed overhead costs fror the part as calculated by the
cost rollup procedure.

Prev Sub Variable Ovhd Contains the total of all sub-level variable overhead costs for the part as calculated by the
cost rollup procedure.

Prev Sub Material Ovhd Contains the total of all sub-level material overhead costs for the part as calculated by the
cost rollup procedure.

Sub Prv Frt Amt Contains the sum of all sub-level freight costs for the part as calculated by the cost rollup procedure.

Sub Prv Other Contains the sum of all sub-level "other" costs for the part as calculated by the cost rollup procedure.

Prev Lot Size This field contains the standard lot size associated with the part number for calculating costs of purchased parts. This lot size is only used when calculating the material overhead that should be applied to the part. The lot size on the routing file is used in the calculation of labor.

Stamp Date Current This field is for reference only and cannot be changed. It is updated when COST.P1 or COST.P2 is processed.

Stamp Date Std This field is for reference only and cannot be changed. It is updated when COST.P1 or COST.P2 is processed.

Stamp Date Previous This field is for reference only and cannot be changed. It is updated when COST.P1 or COST.P2 is processed.

Version 8.10.57