# Work Order Inventory Availability Listing with Order Data (PICKER.R3)

Read Time: 3 minute(s)

#

Job ID Enter a unique ID if you wish to enter and save the parameters to this procedure for future use. If you only need to run the procedure and do not want to save your entry then you may leave this field empty.

Destination Select the destination for the output from this procedure.

Process Select the method to be used for processing the report. Foreground is always available and must be used when output is directed to anything other than a system printer (i.e. printers spooled through the database on the host computer.) Depending on your setup there may be various batch process queues available in the list that allow you to submit the job for processing in the background or at a predefined time such as overnight. A system printer must be specified when using these queues.

Format Select the format for the output. The availability of other formats depends on what is allowed by each procedure. Possible formats include Text, Excel, Word, PDF, HTML, Comma delimited and Tab delimited.

Layout You may indicate the layout of the printed page by specifying the appropriate setting in this field. Set the value to Portrait if the page is to be oriented with the shorter dimension (usually 8.5 inches) at the top or Landscape if the longer dimension (usually 11 inches) is to be at the top. Portrait will always be available but Landscape is dependent on the output destination and may not be available in all cases.

Copies Enter the number of copies to be printed.

Run Process Click on the button to run the process. This performs the save function which may also be activated by clicking the save button in the tool bar or pressing the F9 key or Ctrl+S.

Work Order Numbers Enter the un-pulled work order that you want to display or print. If the work order is not being backflushed, the status of the work order must be N, O or R. If the work order is scheduled for backflushing the status on the work order must be P and no material can have been issued to the work order.

Shortages Only Check this box if you only want to include items with a shortage on the listing.

I)nv Balance or M)RP Proj There are two options available to determine what items on the pick list will be short. If you enter the letter "I" the system will determine what the shortages would be if you pulled the kit immediately from the inventory location specified on the work order. If the letter "M" is entered then the system will check the MRP projected balance for each part on the work order release date. Since the MRP projected balance represents all of the known demand for the part, it will give you a worst case shortage situation.

Last Status Message Contains the last status message generated by the program.

Last Status Date The date on which the last status message was generated.

Last Status Time The time at which the last status message was generated.

Version 8.10.57