# Work Order Bill of Material Entry (WOBOM.E)
Read Time: 1 minute(s)
Form Details
Form Details
Purpose
The WOBOM.E procedure is used to make changes to work order bill of Material
records (WOBOM).
The information contained in each record consists of the item numbers, part numbers, quantities, start and end effective dates and reference designation information for each item on the assembly parts list.
If desired the user may load a existing engineering bill of material by entering the part number of an existing bill of material at the prompt called "Load".
Frequency of Use
As required.
Prerequisites
Entry of work order associated with the work order bill of material.