# Bill of Material Comparison (BOM.R6)

Read Time: 1 minute(s)

Form Details
Form Details

Purpose
The BOM.R6 procedure is used to compare the contents of one bill of material record with another. You are asked which of the elements of the bill of material to be compared, which includes line item numbers, part numbers, type codes, quantities and reference designators. You may also compare a bill of material to itself at different points in time by entering the same bill of material number at both prompts with different effectivity dates. The report will include each item on the bill of materials that are different from one another based on the criteria entered. A line of asterisks (*) will appear beneath each element that is different.

Frequency of Use
As required.

Prerequisites
Entry of the selected Bill of Material records ( BOM.E ).

Data Fields

Li# The line item number.
Part Number The part number of the component.
Code One of the following four codes defining the part. C - Component part A - Assembly P - Phantom assembly L - Line
Quantity The quantity required of the part to make one unit of the assembly defined by the bill of material.
Reference Designator Reference designator information for the associated part number.

Version 8.10.57