# Critical Path Report (BOM.R8)

Read Time: 1 minute(s)

Form Details
Form Details

Purpose
The critical path report indicates the longest path through the product structure based on the processing time defined in the routing file. The report steps through each level of the bill of material structure for the assemblies specified by the user. As it goes through each level it accumulates the processing time required to complete each sub level assembly in the structure. The path through the product structure representing the longest time required is displayed in indented format. This allows planning to concentrate on the items most critical to completing the item on time.

Frequency of Use
As required.

Prerequisites
None.

Data Fields

Level The level in the product structure at which the associated part number is positioned.
Part Number The part number at the associated level in the structure.
Description The part description from the parts master.
Lead The individual lead time, in days, of the associated part number.
Days The cummulative number of days, from the bottom of the structure upwards, indicating the elapsed time required to complete that level.