# MRP End Item Pegging Report (MRP.R3)
Read Time: 1 minute(s)
Form Details
Form Details
Purpose
The MRP.R3 procedure is used to create MRP end item pegging listings. The user
must specify each part number to be included in the report. The report will
show each end item which is the ultimate source of demand for the part numbers
requested.
Frequency of Use
As required.
Prerequisites
Building of the MRP files ( MRP.P1 ).
Data Fields
Assembly Number The part numbers of all the assemblies generating demand
for the part number.
Assembly Description The first line of the description for each of the
assemblies listed.
Quantity The total demand generated by the associated assembly for the
part.