# Rebuild SPEC.CONTROL Record (PARTS.P5)

Read Time: 1 minute(s)

Form Details
Form Details

Purpose
This process loads SPEC.CONTROL with any specifications that are already defined in PARTS.E . This is used most often when specifications already exist in parts records that may have been imported from another system. Running this process avoids the need to key these specifications in by hand.

Frequency of Use
As required.

Prerequisites
None.

Version 8.10.57