# Bill of Material Effectivity Purge (BOM.P2)

Read Time: 1 minute(s)

Form Details
Form Details

Purpose
The BOM.P2 procedure is used to purge lines from the Bill of Material file based upon a selected effectivity date. Line items which contain an effectivity date prior to the date selected will be removed from the Bill of Material record.

Frequency of Use
The frequency with which a purge is performed will vary depending on such factors as available disk space and the amount of on-line history desired. At a minimum purges should be performed on a yearly basis. Purging on a quarterly or even a monthly basis may be desirable if the volume of transactions is fairly high.

Prerequisites
It is strongly recommended that a full account backup be performed prior to executing any purge process. It is also recommended that this be a permanent backup so that any records which were purged can be restored at a later date if required.

Version 8.10.57